Search results

€219.35
Structure expansion joints up to 30 mm wide. Its design facilitates the absorption of movements derived from thermal variations, allowing movement in three axes. With a non-slip grooved face and very heavy load support, it is excellent for high traffic areas. DELIVERY TIME 7-10 DAYS APPROXIMATELY
Plinths accesories

Novorodapie Eclipse - Side cover

165
€4.64
Side cover for LED skirting board made of aluminum for placement as a socket in installations with laminated plasterboard. It allows the installation of an LED lighting strip (Not included) in the interior cavity, giving the profile a double functionality with a high decorative load thanks to the indirect ambient light.
€62.38
Decorative aluminum skirting board for finishing of yeco plates, of elegant simple design. Allows you to place led lighting in the socket to create ambient light. This profile is highly versatile and reversible. It can be used not only as a skirting board, but also as an intermediate or top trim on the wall in two different positions. 
Aluminium stair nosing profile to protect and decorate stairs covered with ceramic. The design of its recess allows the installation of any LED strip without the need for a diffuser, giving the profile a greater decorative charge. Its visible anti-slip face contributes to increasing the safety of the staircase. Dimensions a = 22 mm / h = 10 - 12 mm
Accessories for stair steps

Novopeldaño Eclipse - Side cover

165
€4.81
Aluminium stair nosing profile to protect and decorate stairs covered with ceramic. The design of its recess allows the installation of any LED strip without the need for a diffuser, giving the profile a greater decorative charge. Its visible anti-slip face contributes to increasing the safety of the staircase. Dimensions a = 22 mm / h = 10 - 12 mm
Product added to wishlist
Product added to compare.

SPECIAL OFFER

from May 29 to June 2, 2024

10% discount on all products

using the coupon: CAN2024

IMPORTANT NOTICE

Due to the local holiday of May 30, orders placed between

05/29 and 06/02 will be processed starting Monday, June 3.

Sorry for the inconvenience.